







pile driving
to drive piles
These can be used in any piled building and with any common piling method.
The 110-decibel level of piling risks perforation of the eardrum, which leads to hearing loss.

Create PNGs with pinyin, highlight character parts or remove strokes
Open the tool →
Picture and word Bingo for your class
Open the tool →
Printable tracing sheets with a QR learning companion
Open the tool →
Chinese and English fill-in vocabulary worksheets
Open the tool →打桩 (dǎ zhuāng) means “pile driving, to drive piles”.
打桩 is pronounced dǎ zhuāng in Mandarin Chinese.
“pile driving” is 打桩 (dǎ zhuāng) in Chinese.
This page has 2 example sentences using 打桩, each with pinyin and an English translation.